i have a project management home work need to be done and i need help please check the requirements below thank you

Instructions – PLEASE READ THEM CAREFULLY

The Assignment must be submitted on Blackboard (WORD format only) via allocated folder.

Assignments submitted through email will not be accepted.

Students are advised to make their work clear and well presented, marks may be reduced for poor presentation. This includes filling your information on the cover page.

Students must mention question number clearly in their answer.

Late submission will NOT be accepted.

Avoid plagiarism, the work should be in your own words, copying from students or other resources without proper referencing will result in ZERO marks. No exceptions.

All answered must be typed using Times New Roman (size 12, double-spaced) font. No pictures containing text will be accepted and will be considered plagiarism).

Submissions without this cover page will NOT be accepted.

ASSIGNMENT-2

Project Management (MGT323)

Second Semester (2019-2020)

Assignment Workload:

This Assignment consists of Critical thinking Question.

Assignment is to be submit by each student individually.

Assignment Purposes/Learning Outcomes:

After completion of Assignment-2 students will able to understand the

Demonstrate a deep understanding of project management concepts and theories as well as approaches to project management. (LO-1.1)

Demonstrate an understanding of the project planning process. (LO-1.6)

Assignment Regulation:

All students are encouraged to use their own words.

Student must apply “Times New Roman Font” with double space within their reports.

The attached cover-page has to be used, duly filled. Submissions without the cover page will NOT be accepted

A mark of zero will be given for any submission that includes copying from other resource without referencing it.

Assignment -2 should be submitted on or before the end of Week-10.

If the assignment shows more than 25% plagiarism, the students would be graded zero.

Assignment Question(s): (Marks-10)

“Failing to plan is planning to fail”, is the proverb that affect project planning. Based on this proverb you are required to answer the questions given below. For better understanding, please refer your textbook chapter-11 and answer accordingly.

1. List few consequences, which arises due to poor planning, and explain them in your words. Give an example of any product, which failed, in the market due to poor planning. (2.5 Marks)

2. Do you think systematic planning help in setting goals and making decisions? Give reasons to support your answer by choosing any event (e.g. product launch, conducting exhibitions etc). (2.5 Marks)

3. Describe the above given proverb with an example based on your understanding. (2 Marks)

4. Identify the type of planning required to establish effective monitoring and controlling in the display of products in Supermarkets and explain the process with any example of your choice. (Refer Pg-413, Figure-11-1 for your understanding). (3 Marks)

Answer:

 

Submit Your Assignment and get professional help from our qualified experts!


i have a project management home work need to be done and i need help please check the requirements below thank you was first posted on June 27, 2020 at 2:05 am.
©2019 "Submit Your Assignment". Use of this feed is for personal non-commercial use only. If you are not reading this article in your feed reader, then the site is guilty of copyright infringement. Please contact me at ukbestwriting@gmail.com

 

"Is this question part of your assignment? We Can Help!"

Essay Writing Service